A small job on paper — half a ton of steel, and a completely different way of living downstairs.

Redbourn, Hertfordshire
The Story

What the homeowners wanted.

The kitchen sat behind a solid wall, cut off from the room with all the light in it. The owners didn't want an extension — they just wanted the downstairs to work as one space. We opened the wall up and carried the load on a 6-metre steel, roughly half a ton of it, craned and lifted into position in a single day.

Services used on this project
Before & After

The transformation.

Internal Alteration & Kitchen Opening — before work started
Before

Before work began — the room with the kitchen visible through the opening in the dividing wall.

Internal Alteration & Kitchen Opening — completed
After

One open kitchen-diner, with light running the full depth of the house.

Behind the scenes

The project journey.

A few moments from along the way — because the way a job is run on site matters as much as the finished photos.

Internal Alteration & Kitchen Opening — step 1: The steel arriving on site and craned off the lorry outside the house.
01The steel arriving on site and craned off the lorry outside the house.
Internal Alteration & Kitchen Opening — step 2: Acrow props taking the load, the wall out and the beam waiting on the floor.
02Acrow props taking the load, the wall out and the beam waiting on the floor.
Internal Alteration & Kitchen Opening — step 3: The beam lifted on trestles and walked into position by hand.
03The beam lifted on trestles and walked into position by hand.
Internal Alteration & Kitchen Opening — step 4: Steel up and sitting on its bearings, with the props still carrying the floor above.
04Steel up and sitting on its bearings, with the props still carrying the floor above.
Internal Alteration & Kitchen Opening — step 5: Beam levelled and fixed, and the ceiling opened right through between the two rooms.
05Beam levelled and fixed, and the ceiling opened right through between the two rooms.
Internal Alteration & Kitchen Opening — step 6: The steel boarded and cased in ready for plastering.
06The steel boarded and cased in ready for plastering.
Internal Alteration & Kitchen Opening — step 7: Plastered and made good — one continuous ceiling line across the new opening.
07Plastered and made good — one continuous ceiling line across the new opening.
Internal Alteration & Kitchen Opening — finished detail
Details & Finishes

The details that make it last.

We spec materials and finishes that hold up — not just on handover day, but ten and twenty years later.

Scope
Structural opening between kitchen & dining room
Steel
6 m beam, approx. half a ton
Finishing
Plastering & making good throughout
Building control
Calculations & sign-off handled by us
Duration
3 weeks on site
The Experience

How it felt to live through.

The family stayed in the house throughout. We sheeted everything, kept the dust where it belonged, and cleared up properly at the end of each day so the kitchen was usable again by the evening.

“We thought it'd be weeks of chaos. It wasn't — they were in, did it properly, and left the place spotless.”

The owners, Redbourn

Planning a renovation project?

We help homeowners create spaces built properly and designed to last.