Oak Cart Lodge
← All Projects
Oak Framing & Roofing

Oak Cart Lodge — Location TBC

From a concrete base in early spring to a finished oak lodge by late summer — every stage photographed as it happened.

Location TBC
The Story

What the homeowners wanted.

This oak cart lodge was built from the ground up, starting with a new concrete base and brick plinth in early spring. The green oak frame was cut, assembled and raised through April and June, with the gable ends clad in dark feather-edge boarding and finished with oak barge boards and a carved finial detail. The roof was then weathered with breathable membrane and battens before the clay plain tiles were laid by hand. The finished lodge provides open bays with the oak frame on full display. The confirmed location, dimensions and specification will be added after the project details have been checked.

Before & After

The transformation.

Oak Cart Lodge — before work started
Before

Before the frame — the concrete base and brick plinth prepared in early spring.

Oak Cart Lodge — completed
After

The finished cart lodge — oak frame, dark cladding and a hand-laid clay tile roof, in daily use.

Behind the scenes

The project journey.

A few moments from along the way — because the way a job is run on site matters as much as the finished photos.

Oak Cart Lodge — step 1: The concrete base and brick plinth laid out on site, ready for the frame.
01The concrete base and brick plinth laid out on site, ready for the frame.
Oak Cart Lodge — step 2: The first oak sections assembled on the new base.
02The first oak sections assembled on the new base.
Oak Cart Lodge — step 3: Posts and wall plates jointed and fitted together on the slab.
03Posts and wall plates jointed and fitted together on the slab.
Oak Cart Lodge — step 4: The oak frame raised into position over the brick plinth.
04The oak frame raised into position over the brick plinth.
Oak Cart Lodge — step 5: The structure near complete — posts, braces and rafters all in place.
05The structure near complete — posts, braces and rafters all in place.
Oak Cart Lodge — step 6: The full oak frame standing, with the roof structure formed.
06The full oak frame standing, with the roof structure formed.
Oak Cart Lodge — step 7: Gable end clad in dark feather-edge boarding, with the oak barge boards fitted.
07Gable end clad in dark feather-edge boarding, with the oak barge boards fitted.
Oak Cart Lodge — step 8: Cladding and joinery fitted to the enclosed bay over the brick base.
08Cladding and joinery fitted to the enclosed bay over the brick base.
Oak Cart Lodge — step 9: The carved oak finial detail finished at the gable.
09The carved oak finial detail finished at the gable.
Oak Cart Lodge — step 10: Breathable membrane and battens laid across the roof slopes.
010Breathable membrane and battens laid across the roof slopes.
Oak Cart Lodge — step 11: Roof battens fixed over the membrane, ready for tiling.
011Roof battens fixed over the membrane, ready for tiling.
Oak Cart Lodge — step 12: The roof structure and covering progressing over the open bays.
012The roof structure and covering progressing over the open bays.
Oak Cart Lodge — step 13: Tiling underway across the main roof and gable.
013Tiling underway across the main roof and gable.
Oak Cart Lodge — step 14: Clay plain tiles laid in courses over the battens.
014Clay plain tiles laid in courses over the battens.
Oak Cart Lodge — step 15: The roof taking shape — each tile laid by hand.
015The roof taking shape — each tile laid by hand.
Oak Cart Lodge — step 16: Tiling continued up the slopes toward the ridge.
016Tiling continued up the slopes toward the ridge.
Oak Cart Lodge — step 17: Close-up of the clay tiles — mixed tones laid in traditional courses.
017Close-up of the clay tiles — mixed tones laid in traditional courses.
Oak Cart Lodge — step 18: The underside of the finished roof, with the oak structure on show.
018The underside of the finished roof, with the oak structure on show.
Oak Cart Lodge — step 19: Inside the lodge — the oak frame left exposed as the main feature.
019Inside the lodge — the oak frame left exposed as the main feature.
Oak Cart Lodge — step 20: The open bays finished and in use.
020The open bays finished and in use.
Oak Cart Lodge — step 21: The completed elevation — cladding, oak trim and tiled roof tied together.
021The completed elevation — cladding, oak trim and tiled roof tied together.
Oak Cart Lodge — step 22: The finished cart lodge, complete and in daily use.
022The finished cart lodge, complete and in daily use.
Oak Cart Lodge — finished detail
Details & Finishes

The details that make it last.

We spec materials and finishes that hold up — not just on handover day, but ten and twenty years later.

Location
To be confirmed
Visible scope
Groundworks, brick plinth, oak frame, cladding, roofing
Frame
Green oak with traditional joints and braces
Finish
Dark feather-edge cladding, oak barge boards and clay plain tiles
Fact-check
Dimensions, specification, approvals and duration to be confirmed
The Experience

How it felt to live through.

The photographs record the build in clear stages: base and plinth, frame raising, cladding, roof covering and the finished lodge. The oak frame stays exposed inside and out, and the clay tile roof was laid by hand in traditional courses.